Showing posts with label Start. Show all posts
Showing posts with label Start. Show all posts

Monday, July 18, 2011

Intel X79 Chipset to Start Shipping in August

Intel will start shipping its high-performance X79 Express chipset for motherboards supporting LGA-2011 and LGA-1356 processors in August, states a recent report that cites sources from Taiwanese motherboard makers.

As previous leaks have suggested, the first LGA 2011 processors will be available in the first quarter of 2012.

As many of you know, the chipset that will power the motherboards which support these processors carries the X79 designation, as Intel decided to skip right over the 6-series classification with this platform.

Just like the P67 and the P55 released before it, the X79 features a PCH (platform controller hub) design as most of the tasks that were handled by the X58 chipset previously, such as PCI Express connectivity, were integrated inside the Sandy Bridge-E CPUs.

However, the X79 packs an impressive array of features compared with its predecessors as it now supports no less than 10 SATA 6Gbps, while the PCH is linked to the CPU via a DMI 2.0 interface as well as through an additional PCI-Express 2.0 x4 link.

This can be enabled or disabled by the user in the motherboard's EFI BIOS and should bring a noticeable performance increase in systems that pack high-performance storage systems.

In addition, the X79 PCH also features an Intel Rapid Storage enterprise controller that enables RAID 0/1/5/10 support and eight of the available SATA interfaces can be configured as SAS ports by motherboard manufacturers.

The rest of the specs list includes an 8-lane PCI-Express 2.0 hub, which can be used to drive the x1 and x4 slots, as well as 14 USB 2.0 ports.

Sadly, the PCH doesn't feature native USB 3.0 or Thunderbolt support, which is an important omission considering its target market.

The first motherboard models to carry the Intel X79 PCH are expected to be announced soon after the chipset starts shipping. However, availability will be limited to 2012, although some server models could see the light of day in Q4 2011, provided that Intel sticks with its plans to release Sandy Bridge-E Xeon CPUs by the end of this year. (via DigiTimes)


View the original article here

Monday, July 4, 2011

PCM 2011 Diary – Stage 1: Tough Start for a Long Tour de France

The usual position among cycling lovers when it comes to the first week of Le Tour is that it's there to allow the smaller teams a few chances of breakaways and to make sprinters battle for the flat, long final straights. The big men in the peloton, which is a French way of referring to the group of cyclists, are supposed to stand back, get some protection from team mates, keep well fed and hydrated and wait for the mountains to roll around so that they can make their mark.

In 2011 the organizers, the Amaury Sports Organization, have taken a slightly different approach which resulted in a first stage of Le Tour that is pretty much flat for the first 190 km only to kick significantly up in the last few kilometers, making it a little difficult for sprinters and their teams.

Both in real world and simulated cycling, the biggest problem with flat stages is that they have a burst of excitement early on as a group of riders try to escape the group and gain a solid lead, so creating a breakaway, and a burst of excitement at the end while most of the stage is rather boring, with teams chasing, eating, bringing up water and sometimes trying to create echelons if the conditions allow it.

Pro Cycling Manager 2011 is very close to the real thing when it comes to these kinds of stages and quickly a break is established and I push the button which introduced 8X time acceleration (if only real life would have that) and sit back, only getting Maxime Montfort to the front in the last 50 km in order to bring the break back and set up a mass sprint.

Here I could play two cards: Benatti, my pure sprinter, who is at a disadvantage because of the uphill in the last km, or Cancellara, my time trial specialist, who can power ahead and try to take the stage.

Unfortunately, I fail to match the pace of the peloton in the last 10 km and I lose my chance at a stage victory, with Oscar Freire from Radobank, who can do a bit of climbing and sprints well, taking the win and Cavendish, from HTC, managing a surprising second place.

Here are the last 10 kilometers of the first stage of Le Tour de France:



View the original article here

LCD Makers Start to Cut Back on Orders

It appears that the semiconductor market is not the only one suffering from oversupply and low sales, as reports also reveal that the liquid crystal display segment is dealing with some issues of its own. Price drops are always a welcome development on the IT market, as far as the customer base is concerned at least.

In truth, the suppliers of such products don't enjoy having to take such steps and do so only when they have no real or better choice in the matter.

One fairly radical example of oversupply causing serious price cuts is the way DRAM chips have been getting cheaper for many months now, with just a few episodes of slight recovery.

Granted, DRAM makers decided to stop letting prices go any lower, even though demand still hasn't picked up.

Now, it has been found that makers of displays are taking their own turn at trying to stabilize their assets.

In this case, however, instead of price cuts, companies are cutting back their production capacities and component orders.

AU Optronics, for instance, has reduced its glass purchases by 15% and intends to utilize only 80% of its production capacity in July, 2011 (the ongoing month). So far, it used 85% of its total.

Meanwhile, Chimei Innolux will cut its own production capacity from the current 90% to 80%, while Samsung and LG Display also intend to reduce theirs by 5%.

Chimei is, as some may or may not know, Taiwan's largest maker of TFT-LCD panels, but the problem behind dropping prices for such items is the oversupply plaguing panel distribution channels.

As for some extra irony, with the economy getting over the negative effects of the Japan disaster, there is no chance of shortages either, so companies really do need to make an active effort to cut back on their losses.


View the original article here

Wednesday, June 29, 2011

MacBooks Start at $829 on Apple Deals Today

Those looking to buy themselves a new Mac and save a few bucks can visit the Apple online store’s Special Deals section for a couple of attractive offers on portable Macs, as well as discounts on desktop systems.

The offers start with an $829 entry-level MacBook Air launched in October 2010.

Discounted by $170, it features a 1.4 GHz Intel Core 2 Duo CPU, an 11.6-inch LED-backlit glossy widescreen display, 2 gigs of memory, 64GB flash storage, NVIDIA GeForce 320M graphics, and a built-in FaceTime camera.

Next up is a refurbished MacBook - the unibody version of the plastic-encased notebook - clocked at 2.4GHz (Intel Core 2 Duo) and featuring a 13-inch display for $849 (save $150).

The white MacBook, once Apple’s most popular Mac, comes with 2GB (2 x 1GB) of 1066MHz DDR3 SDRAM, a 250GB Serial ATA @ 5400 rpm hard drive, the 8x double-layer SuperDrive (DVD±R DL/DVD±RW/CD-RW), NVIDIA GeForce 320M graphics with 256MB of DDR3 SDRAM shared with main memory, and built-in iSight.

For those looking to buy a cheap Mac OS-based server solution, the choice on a refurbished Mac mini with Snow Leopard Server couldn’t be easier.

It saves the buyer $150 for the following benefits: 2.66GHz Intel Core 2 Duo; 4GB memory; dual 500GB Serial ATA hard disk drives; HDMI port with support for up to 1920-by-1200 resolution; NVIDIA GeForce 320M with 256MB memory. The mini comes pre loaded with Snow Leopard Server.

Another discounted desktop Mac, this time consumer oriented, is the refurbished iMac 21.5-inch with a 3.06GHz Intel Core i3 processor.

Originally released July 2010, the all-in-one Mac boasts 21.5-inches of LED-backlit glossy widescreen display goodness, 4GB memory, a 500GB hard drive, the ever-present 8x SuperDrive, and ATI Radeon HD 4670 graphics with 256MB memory. The iMac also comes with a built-in iSight camera.

Visit Apple here to pick up on these offers, and others like them.

About Apple refurbished products
Apple Certified Refurbished Products are pre-owned products that undergo Apple's stringent refurbishment process, prior to being offered for sale. They are returned under Apple's Return and Refund Policies.

While only some units are brought back because of technical issues, all of them undergo the company's rigorous quality-refurbishment process.

Service and support include 90 days of telephone support and a one-year warranty. You have the option of purchasing an AppleCare Protection Plan for your refurb, while shipping is free in the US.


View the original article here

Wednesday, June 22, 2011

Google Marks the Start of Summer with a Couple of Takashi Murakami Doodles (Pics)

Google is running a couple of doodles for the summer solstice, one for each hemisphere. In the north, June 21 marks the start of summer and the longest day of the year. In the south, the opposite is true, June 21 is the shortest day.

Google has commissioned a couple of doodles from Japanese artist Takashi Murakami, known for his original style, appropriating Japanese popular culture themes and styles for use in his art work. The two doodles, one symbolizing the start of summer, the other the start of winter, feature elements very common in his works, including the central characters and the use of flowers, even in the winter-themed doodle.

Google has an in-house doodle department that usually takes care of all of the custom logos that adorn the Google homepage. Its artists regularly get help from some of its many engineers in order to create the more elaborate or imaginative doodles.

Recently, it ran a special doodle for the June 15 lunar eclipse, featuring images of the moon as it was actually seen during the eclipse. After the event, it displayed all of the phases of the eclipse in a controllable slideshow.

Also recently, Google ran a very interesting and popular virtual guitar doodle in the memory of Les Paul. It enable users to play tunes inside the Google homepage and even record them to share them with friends.

That doodle proved so popular that Google kept it running for a second day. However, Google still runs plenty of simpler doodles, with just a custom design for the logo.

Last year on June 21, Google ran a series of doodles, marking both the summer and the winter solstice depicting either vacation spots, for the summer one, or winter activities and imagery such as a warm fireplace and sledding.


View the original article here